The Preparatory Study on Road Improvement Plan in Nacala Development Corridor (n13: Cuamba-Mandimba-Lichinga) in the Republic of Mozambique: Final Report 1 of 3 Summary
Resource type
Author/contributor
- JICA (Author)
Title
The Preparatory Study on Road Improvement Plan in Nacala Development Corridor (n13: Cuamba-Mandimba-Lichinga) in the Republic of Mozambique: Final Report 1 of 3 Summary
Abstract
The objectives of the Study are to determine the most technically feasible and
economically viable, environmentally acceptable and socially optimal option of
upgrading the existing Cuamba – Lichinga road to an all-weather road for easier
transit. The Study also determines the impact of providing an all-weather road
on poverty reduction and environment.
And establishment of the “Regional Development Program” intended for Niassa
Province is also the objective of the Study. This program aims to extend the
improvement effect to the wide area in conjunction with the road improvement
(Nacala N13/N1 and Lichinga-Pemba N14/N1 corridors).
Report Number
1 of 3
Institution
Japan International Cooperation Agency (JICA)
Date
2010/02
Language
English
Accessed
07/04/2021, 13:54
Citation
JICA. (2010). The Preparatory Study on Road Improvement Plan in Nacala Development Corridor (n13: Cuamba-Mandimba-Lichinga) in the Republic of Mozambique: Final Report 1 of 3 Summary (1 of 3). Japan International Cooperation Agency (JICA). https://openjicareport.jica.go.jp/pdf/11991510.pdf
Themes / Temas
Geography / Geografia
Language / Linguagem
Link to this record