Your search
Results 11 resources
-
On February 26, 2021, the Japan International Cooperation Agency (JICA) signed a grant agreement with the Government of the Republic of Mozambique in Maputo, to provide grant aid of up to 2.076billion yen for the Project for the Construction of a Rural Water Supply Facility in Niassa Province. Under this project, people’s living environment in Niassa Province will improve through installing a rural water supply facility, which will allow access to safe and clean water. It is expected that...
-
The project’s objective was to improve access to lower secondary education, by constructing 4 schools and extending the capacity of existing schools and their facilities in the target areas of Maputo Province and Gaza Province, thereby contributing to improvement of the quality of education. The project’s objective coincides with the development policy of Mozambique, which emphasizes the expansion of access to secondary education at the time of planning and also ex-post evaluation. It also...
-
Maps of JICA Major Projects
-
Ex-post evaluation of ODA projects has been in place since 1975 and since then the coverage of evaluation has expanded. Japan’s ODA charter revised in 2003 shows Japan’s commitment to ODA evaluation, clearly stating under the section “Enhancement of Evaluation” that in order to measure, analyze and objectively evaluate the outcome of ODA, third-party evaluations conducted by experts will be enhanced. This volume shows the results of the ex-post evaluation of Grant Aid projects that were...
-
The laws and regulations for hiring foreign nationals have been enacted with the aim of protecting the national workforce, ensuring the availability of jobs for them, while limiting employment of foreigners to those positions with levels of technical and professional skills and qualifications which are either nonexistent or insufficient in the country. Historically, the main instrument used by the Mozambican Government to achieve foreign investment promotion balanced with national...
-
The objectives of the Study are to determine the most technically feasible and economically viable, environmentally acceptable and socially optimal option of upgrading the existing Cuamba – Lichinga road to an all-weather road for easier transit. The Study also determines the impact of providing an all-weather road on poverty reduction and environment. And establishment of the “Regional Development Program” intended for Niassa Province is also the objective of the Study. This program aims...
-
The objectives of the Study are to determine the most technically feasible and economically viable, environmentally acceptable and socially optimal option of upgrading the existing Cuamba – Lichinga road to an all-weather road for easier transit. The Study also determines the impact of providing an all-weather road on poverty reduction and environment. And establishment of the “Regional Development Program” intended for Niassa Province is also the objective of the Study. This program aims...
-
The objectives of the Study are to determine the most technically feasible and economically viable, environmentally acceptable and socially optimal option of upgrading the existing Cuamba – Lichinga road to an all-weather road for easier transit. The Study also determines the impact of providing an all-weather road on poverty reduction and environment. And establishment of the “Regional Development Program” intended for Niassa Province is also the objective of the Study. This program aims to...
-
Project outline Project Overview: - This project is to secure smooth and safe connectivity at the road N380 (Sunate - Oasse) through reconstruction of bridges, Messalo1 (45m)/ Messalo-3 (60m)/ Mapuede (45m), thereby contributing to facilitate the economy of Cabo Delgado and neighboring countries
-
Final JICA report on Nacala Corridor Development Project, whose objectives include: to clarify organizations for promoting and coordinating the implementation of development strategies for the Nacala Corridor Region in accordance with PEDEC-Nacala and to prepare for the implementation of high priority projects in accordance with PEDEC-Nacala. The study project commenced in April 2012 and the final study report was produced in April 2015.
-
1. What is JICA? Since joining the Colombo plan in 1954, Japan has been providing financial and technical assistance to developing countries through ODA (Official Development Assistance). JICA is the "one stop shop of Japan's bilateral ODA'', providing Technical Cooperation, ODA Loans (Concessional Loans) and Grant Aid. JICA has a network of more than 90 overseas offices. In Mozambique, JICA opened office in 2003. 3. Priority Areas in Mozambique: 1) Activation of Regional and Local...
Explore
Themes / Temas
Sectors / Setores
Geography / Geografia
-
Mozambique / Moçambique
(11)
- Central / Centro (1)
-
North / Norte
(7)
- Cabo Delgado (2)
- Nacala (5)
- Nampula (1)
-
Niassa
(2)
- Lichinga (1)
- Rest of the World / Rest of the World (1)
Methods / Métodos
Language / Linguagem
Resource type
- Blog Post (1)
- Map (1)
- Presentation (2)
- Report (7)